Commisioning in PLC system development
|
| |
Date:2010-08-01 08:25:21Click:10Comment:0
|
| When a new machine is being prepared for production, or has been delivered by a supplier, it is normal to go through a set of commissioning procedures. Some typical steps are listed below. 1. Visual inspection verify that the machine meets internal |
|
 |
Documentation in PLC program
|
| |
Date:2010-08-01 08:17:53Click:13Comment:0
|
| Poor documentation is a common complaint lodged against control system designers. Good documentation is developed as a project progresses. Many engineers will leave the documentation to the end of a project as an afterthought. But, by that point man |
|
 |
Program Verification and Simulation in PLC system development
|
| |
Date:2010-08-01 08:11:27Click:12Comment:0
|
| After a program has been written it is important to verify that it works as intended, before it is used in production. In a simple application this might involve running the program on the machine, and looking for improper operation. In a complex ap |
|
 |
How to Develop a Program Structure in PLC System
|
| |
Date:2010-08-01 08:07:12Click:10Comment:0
|
| Understanding the process will simplify the controller design. When the system is only partially understood, or vaguely defined the development process becomes iterative. Programs will be developed, and modified until they are acceptable. When infor |
|
 |
Line Symbols and Types, Sensor and Actuator Symbols and Types
|
| |
Date:2010-06-14 21:05:20Click:29Comment:0
|
| The line symbols also describe the type of flow. See Flow Line Symbols and Types shows a few of the popular flow lines. Flow Line Symbols and Types See Sensor and Actuator Symbols and Types shows some of the more popular sensor and actuator symbols. |
|
 |
Troubleshooting and Forcing in PLC software
|
| |
Date:2010-05-30 07:30:33Click:28Comment:0
|
| Troubleshooting After a system is in operation it will eventually fail. When a failure occurs it is important to be able to identify and solve problems quickly. The following list of steps will help track down errors in a PLC system. 1. Look at the |
|
 |
Debugging function in PLC software
|
| |
Date:2010-05-30 07:29:14Click:14Comment:0
|
| Most engineers have taken a programming course where they learned to write a program and then debug it. Debugging involves running the program, testing it for errors, and then fixing them. Even for an experienced programmer it is common to spend mor |
|
 |
Fail Safe Design in PLC software
|
| |
Date:2010-05-30 07:24:50Click:18Comment:0
|
| It is necessary to predict how systems will fail. Some of the common problems that will occur are listed below. Component jams - An actuator or part becomes jammed. This can be detected by adding sensors for actuator positions and part presence. Ope |
|
 |
An Electrical Schematic with a PLC
|
| |
Date:2010-02-21 03:29:33Click:139Comment:0
|
| When including a PLC in the ladder diagram still remains. But, it does tend to become more complex. See An Electrical Schematic with a PLC shows a schematic diagram for a PLC based motor control system, similar to the previous motor control example. |
|
 |
An Industrial Controls Cabinet example
|
| |
Date:2010-02-07 03:02:58Click:65Comment:0
|
| Once the electrical design is complete, a layout for the controls cabinet is developed, as shown in See A Physical Layout for the Control Cabinet. The physical dimensions of the devices must be considered, and adequate space is needed to run wires b |
|
 |
The common trend is to adopt a user interface which often have
|
| |
Date:2010-01-16 00:41:04Click:16Comment:0
|
| The common trend is to adopt a user interface which often have, - Icons - A pointer device (such as a mouse) - Full color - Support for multiple windows, which run programs simultaneously - Popup menus - Windows can be moved, scaled, moved forward/ba |
|
 |
The current demands on user interfaces
|
| |
Date:2010-01-16 00:40:28Click:11Comment:0
|
| The current demands on user interfaces are, - on-line help - adaptive dialog/response - feedback to the user - ability to interrupt processes - consistent modules - a logical display layout - deal with many processes simultaneously |
|
 |
First step is to identify before designing an HMI interface
|
| |
Date:2010-01-16 00:39:06Click:26Comment:0
|
| To design an HMI interface, the first step is to identify, 1. Who needs what information? 2. How do they expect to see it presented? 3. When does information need to be presented? 4. Do the operators have any special needs? 5. Is sound important? 6. |
|
 |
Introduction of Human Machine Interface (HMI) in PLC control system
|
| |
Date:2010-01-09 19:58:22Click:55Comment:0
|
| These allow control systems to be much more interactive than before. The basic purpose of an HMI is to allow easy graphical interface with a process. These devices have been known by a number of names, - touch screens - displays - Man Machine Interf |
|
 |
Introduction of Mail Transfer Protocols
|
| |
Date:2009-12-17 00:37:16Click:7Comment:0
|
| Popular email methods include, SMTP (Simple Mail Transfer Protocol) - for sending mail POP3 - for retrieving mail IMAP - for retrieving mail Note that the campus mail system `ccmail' is not standard. It will communicate with other mail programs usin |
|
|
 |
|